NGL/LPG Plant Retrofit Design Checklist

Ortloff Engineers can complete a first pass analysis on a retrofit design if we have the information required in the New Plant Design Checklist plus an original process flow diagram and material balance.

A more thorough retrofit design will require as much of the following additional information as possible:

Ideally, we prefer to borrow a complete set of engineering data books for use during the final design of the retrofit. The data books typically contain all the information needed to properly re-rate the existing equipment.

A retrofit design can be much more time consuming than a new plant design. This is because the performance of all the existing equipment including the compressors and exchangers must be accommodated in the retrofit design.

Process performance guarantees are available for both new plant and retrofit designs. Ortloff can also work with your chosen contractor during the detailed design stage of the project to make sure that the final design will perform as expected.